Epson DM-D210 Installation Guide Page 30

  • Download
  • Add to my manuals
  • Print
  • Page
    / 34
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 29
28 DM-D210 Installation Guide
English
Performing Self Test
To perform the self test, follow the steps below.
1. Turn off the power for the DM-D210.
2. Set the SW 1-8 of the DIP switch to ON, and turn on the power.
Note:
If the contents of the self test are not displayed, the DM-D210 may be
malfunctioning. Contact your DM-D210 dealer for assistance.
When the self test is finished and no error occurs, the DM-D210 is
ready to receive data.
Diagnostics
The DM-D210 has the diagnostics function. When the DM-D210 is
turned on, diagnostics, such as internal memory test, is carried out
regardless of the DIP switch settings. When an error is detected, the
error message is displayed and no operation is carried out until
power is turned off.
Page view 29
1 2 ... 25 26 27 28 29 30 31 32 33 34

Comments to this Manuals

No comments