Epson Stylus Color 660 Service Manual Page 93

  • Download
  • Add to my manuals
  • Print
  • Page
    / 152
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 92
EPSON Stylus COLOR 670 Revision A
Disassembly and Assembly Disassembly 93
4.2.5.8 CR Assembly Removal
1. Remove the Housing. (See Housing Removal on page 72)
2. Push the Driven Pulley Holder to the right (seen from the front side of the
printer) to loosen the Timing Belt and detach the Timing Belt from the CR
Motor Pinion Gear.
Figure 4-38. CR Timing Belt Removal
3. Take out the Compression Spring 19.6 from the Driven Pulley Holder.
4. Remove the Driven Pulley Assembly with the Timing Belt from the Driven
Pulley Holder. (Pull the Driven Pulley Assembly diagonally to the upper
left.)
Figure 4-39. Driven Pulley Assembly Removal
5. Move the Driven Pulley Holder to the right and remove it from the frame.
6. Release 2 PG Lever securing hooks from the Right Frame and remove the
PG Lever.
Figure 4-40. PG Lever Hook Release
7. Release1 hook of Sub PG Lever and remove the Sub PG Lever and Spring
Washer from the right end of the CR Guide Shaft.
8. Remove 1 screw securing the Right Parallelism Adjust Bushing to the
Right Frame.
Figure 4-41. Sub PG Lever and Spring Washer Removal
CR Timing Belt
CR Motor Pinion Gear
Driven Pulley Holder
Driven Pulley Assembly
CR Timing Belt
Compression
Spring 19.6
PG Lever Fixing Hook
PG Lever
Right Parallelism
Adjust Bushing
Sub PG Lever
Right Parallelism Adjust
Bushing Securing Screw
Spring Washer
Page view 92
1 2 ... 88 89 90 91 92 93 94 95 96 97 98 ... 151 152

Comments to this Manuals

No comments