8-4
Temperature Calibration Verification Test
Use this procedure to verify that your Applied Biosystems
GeneAmp PCR System 9600 still meets the temperature
accuracy specification.
Equipment Required
You will need the following equipment to perform this procedure:
Temperature Verification System, (Part No. N801-0435)
which includes:
♦
Digital thermometer with 9V battery installed
♦
RTD probe
♦
Cotton swabs
♦
Light mineral oil
♦
Probe tray
Verifying the Temperature Calibration
Perform the procedure as described in the following steps. We
recommend that you perform this procedure immediately after
you turn on the instrument.
Note
Refer to the Instructions included with your Temperature
Verification System for a detailed description on operating the digital
thermometer.
1
If the heated cover is in the forward position, turn the cover knob
completely counterclockwise, then slide the cover back.
Comments to this Manuals